JL - 8.1.18 66713 6E44 Hexthorpe - Ribblehead, Ribblehead Siding

No mistakes this time!
After the aborted attempt to operate this diagram before Christmas there were many GBRf men on site to ensure today's operation ran smoothly. The reason for the previous cancellation was wagons 'contaminated' with left over stone from a previous working. This meant the whole lot had to work back to Doncaster. This time there was no mistake and after backing into the siding the GBRf chaps inspected each wagon. 66713 sits in the siding after arriving with 6E44 Hexthorpe - Ribblehead. The loader is started and waiting impatiently to get going.
After the aborted attempt to operate this diagram before Christmas there were many GBRf men on site to ensure today's operation ran smoothly. The reason for the previous cancellation was wagons 'contaminated' with left over stone from a previous working. This meant the whole lot had to work back to Doncaster. This time there was no mistake and after backing into the siding the GBRf chaps inspected each wagon. 66713 sits in the siding after arriving with 6E44 Hexthorpe - Ribblehead. The loader is started and waiting impatiently to get going.
![]() |